DR250RS - page 3
Pre-race Trimm
After much effort & late nights the bike is ready for its first race.
Check-out these images of what is at the moment a very clean bike !
![]() |
![]() |
Apart from stripping the bike down
to check all was OK, basic
maintenance such as greasing the rising link was done at the same time.
As a precaution a new chain link was fitted and really should be replaced
regularly even if the chain itself looks good .
The bike was then fitted with a new Bridgestone ED660A rear tyre, which
although ideal for enduros, has yet to inspire confidence on-road ! The
front is still sporting a year old (but still in good nick) ED03.
Post-race Trimm
3 hours of hard riding at SETRA's Tidworth event, not only resulted
in a good finish but a very muddy and sad looking DR, oh well back to work !
SETRA result :-
Top DR250, 9th Suzuki, 30th 250 & 66th fastest special stage o/all !
Handlebar positions changed , plus animation page 4 !
Click here to go home